山東電纜橋架選擇安裝注意事項

  山東電纜橋架選擇安裝注意事項:
  Shandong cable tray selection installation note:
  1.電纜橋架的大載荷、支撐間距應小于允許載荷和支撐跨距。
  The maximum load, 1 cable tray support spacing should be less than the allowable load and support span.
  2.橋架的安裝應以規范為準,目前可參照《電纜橋架安裝圖集86SD169》進行。橋架在安裝過程中嚴禁載人,如現場情況確有必要時,必須有保障設施方可載人,本事項對于不合格或非的操作人員尤為重要。
  2 bridge should be installed in the national standards, the reference to "86SD169" of cable tray installation atlas. Bridge in the installation process is strictly prohibited manned, such as the scene when necessary, must have the safety protection facilities shall be manned, this for the unqualified or non professional personnel is very important.
  3.橋架的立柱、托臂等支架可與基礎預埋件焊接固定,也可采用膨脹螺栓固定,對于現場焊接處一定要做好防腐處理,通常由用戶現場涂刷防腐漆。
  The column, the bracket can be fixed with 3 bridge welding based embedded parts, also can use expansion bolts, the welding place should be well treated, usually by the user site besmear brushs anticorrosive paint.
  4.電纜橋架水平敷設時,橋架間的對接處距支承點的距離應在跨距的1/4以內,對于大跨距橋架好放在支承架上對接,在有彎通或三通的地方則需單獨增加支承點,垂直方向的托臂每隔1.5m設一固定點。
  4 cable bridge horizontal laying, the distance of supporting points should be in 1 / 4 span bridge within the joint between the distance, it is better for large span bridge connection on the supporting frame, were individually increases the supporting point in a general or three place, perpendicular to the direction of the bracket is provided with a fixed interval of 1.5m.
  5.橋架內的電纜應用電纜卡帶、或金屬電纜卡子進行分組固定。對于水平敷設的電纜通常每隔2m左右作一固定點;對于垂直敷設的電纜應每隔1—1.5m固定一次,在改變標高的端部也應予以固定。
  Cable cable cassette, or metal cable clip 5 group fixed tray. For laying cable level usually every 2m around a fixed point; the cable lifting should be every 1 1.5m fixed time, in the end changes should also be fixed.
  6.電纜橋架按電力施工規范要求應進行良好接地,對于鍍鋅電纜橋架無須有專門接地裝置,其本體即可作為接地干線;對于表面進行非金屬處理的橋架則必須有專門的接地裝置;橋架的接地線可用VV-16mm2電纜或等截面的銅編織線,該線通常由用戶自備,如由本廠供貨,則應在合同中注明,長距離的電纜橋架每隔30—50m接地一次。
  6 cable tray should be a good grounding in electric power construction specifications, for galvanized cable tray without special grounding device, which can be used as a grounding line; for the surface of non metal bridge must have ground special equipment; bridge ground be used VV-16mm2 cable or section of the copper braided wire, the line is owned by the user, such as by the factory delivery, it should be noted in the contract, the long distance cable tray every 30 50m grounding once.
  以上就是山東電纜橋架公司發布,如果還有什么疑問,歡迎來電咨詢!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 北京律师事务所_房屋拆迁律师_24小时免费法律咨询_云合专业律师网 | 不锈钢闸阀_球阀_蝶阀_止回阀_调节阀_截止阀-可拉伐阀门(上海)有限公司 | 沈阳建筑设计公司_加固改造设计_厂房设计_设计资质加盟【金辉设计】 | 三效蒸发器_多效蒸发器价格_四效三效蒸发器厂家-青岛康景辉 | SMC-ASCO-CKD气缸-FESTO-MAC电磁阀-上海天筹自动化设备官网 | 电液推杆生产厂家|电动推杆|液压推杆-扬州唯升机械有限公司 | 磁力加热搅拌器-多工位|大功率|数显恒温磁力搅拌器-司乐仪器官网 | 数年网路-免费在线工具您的在线工具箱-shuyear.com | 黑田精工电磁阀-CAMMOZI气缸-ROSS电磁-上海茂硕机械设备有限公司 | 【星耀裂变】_企微SCRM_任务宝_视频号分销裂变_企业微信裂变增长_私域流量_裂变营销 | 列管冷凝器,刮板蒸发器,外盘管反应釜厂家-无锡曼旺化工设备有限公司 | 广东青藤环境科技有限公司-水质检测 | 无味渗透剂,泡沫抑尘剂,烷基糖苷-威海威能化工有限公司 | 青岛侦探_青岛侦探事务所_青岛劝退小三_青岛调查出轨取证公司_青岛婚外情取证-青岛探真调查事务所 | EPDM密封胶条-EPDM密封垫片-EPDM生产厂家 | 刚性-柔性防水套管-橡胶伸缩接头-波纹管补偿器-启腾供水材料有限公司 | 艺术涂料_进口艺术涂料_艺术涂料加盟_艺术涂料十大品牌 -英国蒙太奇艺术涂料 | 经济师考试_2025中级经济师报名时间_报名入口_考试时间_华课网校经济师培训网站 | 超声骨密度仪-动脉硬化检测仪器-人体成分分析仪厂家/品牌/价格_南京科力悦 | 【电子厂招聘_普工招工网_工厂招聘信息平台】-工立方打工网 | 山西3A认证|太原AAA信用认证|投标AAA信用证书-山西AAA企业信用评级网 | 齿轮减速电机一体机_蜗轮蜗杆减速马达-德国BOSERL齿轮减速机带电机生产厂家 | 生物制药洁净车间-GMP车间净化工程-食品净化厂房-杭州波涛净化设备工程有限公司 | 【电子厂招聘_普工招工网_工厂招聘信息平台】-工立方打工网 | 全自动变压器变比组别测试仪-手持式直流电阻测试仪-上海来扬电气 | 派财经_聚焦数字经济内容服务平台| 盘煤仪,盘料仪,盘点仪,堆料测量仪,便携式激光盘煤仪-中科航宇(北京)自动化工程技术有限公司 | 短信通106短信接口验证码接口群发平台_国际短信接口验证码接口群发平台-速度网络有限公司 | 托盘租赁_塑料托盘租赁_托盘出租_栈板出租_青岛托盘租赁-优胜必达 | 江苏农村商业银行招聘网_2024江苏农商行考试指南_江苏农商行校园招聘 | 工业CT-无锡璟能智能仪器有限公司 | 电子万能试验机_液压拉力试验机_冲击疲劳试验机_材料试验机厂家-济南众标仪器设备有限公司 | 电脑知识|软件|系统|数据库|服务器|编程开发|网络运营|知识问答|技术教程文章 - 好吧啦网 | 天然气分析仪-液化气二甲醚分析仪|传昊仪器 | 耐压仪-高压耐压仪|徐吉电气 | 北京开业庆典策划-年会活动策划公司-舞龙舞狮团大鼓表演-北京盛乾龙狮鼓乐礼仪庆典策划公司 | 3d打印服务,3d打印汽车,三维扫描,硅胶复模,手板,快速模具,深圳市精速三维打印科技有限公司 | 优宝-汽车润滑脂-轴承润滑脂-高温齿轮润滑油脂厂家 | 巨野月嫂-家政公司-巨野县红墙安康母婴护理中心 | 海鲜池-专注海鲜鱼缸、移动海鲜缸、饭店鱼缸设计定做-日晟水族厂家 | 2025福建平潭岛旅游攻略|蓝眼泪,景点,住宿攻略-趣平潭网 |